The first assembly of the AG600 batch production has been delivered for test flight.
On May 12, Jin10 reported that the first aircraft of the AG600 batch production (aircraft 1101) has completed final assembly and is off the production line. Currently, the second aircraft of the AG600 batch production (aircraft 1102) has completed the installation of major systems such as the engine and landing gear, and the wiring harness insulation has been tested for continuity. The third aircraft in batch production (aircraft 1103) has also completed the assembly of major components such as the wings and vertical stabilizer, and has entered the system installation phase.
- 1